Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Commission hears MPO plan for C-13 Canal Greenway; residents press for south-side routing

City of Sunrise Commission · February 24, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Broward MPO staff presented three alternatives for a C-13 Canal Greenway linking Hiatus Road to University Drive; commissioners and residents pressed safety, privacy and connectivity concerns and signaled support for a resolution of support after more outreach and a preferred-alternative decision.

Broward MPO staff and a consultant outlined the proposed C-13 Canal Greenway on a presentation to the Sunrise City Commission, describing three alignment alternatives and a public outreach history. The project, included in the MPO's Local Agency Program planning and in the city's updated bicycle and pedestrian master plan, would create a 10'12 to 12-foot shared-use path along the C-13 canal between Hiatus Road and University Drive, with engineering programmed for fiscal year 2027.

The consultant said the MPO held two public workshops and collected about 42 comment cards; 20 favored the south-side alignment, 14 favored the south-to-north switch at Pine Island Road,…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans