Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Fitch Aquatic Stain topic

No spam. Unsubscribe anytime.

Council authorizes test stain for Fitch Aquatic Center precast panels, empowers staff to pilot and report back

Ames City Council · March 24, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

After review of precast panel appearance, the council authorized staff to run a larger test patch of a penetrating opaque stain (staff-preferred 'Rushing River') to evaluate whether staining will eliminate blotchy/variable coloration; staff may proceed with full staining only if test results meet design expectations.

Council considered options for addressing a blotchy, inconsistent appearance on precast concrete panels at the new Fitch Aquatic Center. Staff and the design team presented a mock-up showing the proposed 'Rushing River' opaque penetrating stain and reported the manufacturer would warranty the product for 25 years when applied per instructions. Construction staff said the stain is designed to reduce visible modeling and produce a more uniform facade.

Council debated whether to accept a contractor credit instead of staining, to pursue full staining immediately, or to test a larger area first. Concern was raised about sealing the concrete and losing the ability to revert or improve later if the stain is unsatisfactory. Council authorized staff to proceed with alternative 1 (staining using the proposed color) but directed staff to carry out a larger test patch in a less-visible but representative area and return if the test indicates the stain does not sufficiently eliminate the blotchy effect. Construction operations committed to provide detailed warranty/specification language to staff for review before any full-application decision.