Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Aztec commission tables $2.4 million South Aztec water tank bid pending steel vs. concrete cost review
Summary
The commission tabled the bid award for the South Aztec water tank replacement project after commissioners requested a side-by-side cost and longevity comparison of the concrete tank specified in the bid and a steel alternative; staff said the city can request a steel design and will provide engineer estimates.
The Aztec City Commission on March 10 tabled a $2.408 million bid award for the South Aztec water tank replacement project after commissioners asked staff to provide a cost comparison showing the trade-offs between the concrete tank included in the bid and a steel tank alternative.
During discussion, a commissioner asked why the design specified a concrete tank rather than steel and requested the project timeline and longevity figures. A staff member explained that…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

