Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Mounds View board previews Pinewood geothermal, turf installations and districtwide summer repairs

Mounds View School Board · March 11, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The school board heard a summer-operations preview outlining routine repairs, Pinewood Elementary’s geothermal conversion (including drilling two wells and boiler conversion), temporary relocation of Pinewood summer programming, and athletic field turf installations at both high schools.

The Mounds View School Board on March 10 heard a detailed preview of planned 2026 summer facilities work including a geothermal conversion at Pinewood Elementary that will replace domestic water lines, drill two wells and convert boilers from steam to hot water.

Darren Johnson, the district’s executive director of school management, told the board the work ranges from routine maintenance — painting, flooring, concrete and curb repairs, seal-coating and restriping of parking lots, cabinetry repairs and door/fob replacements — to larger projects at…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans