Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

MTA board authorizes up to $692,029 to repair longstanding Nestor sinkhole

Nashville Metropolitan Transit Authority Board · March 27, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Nashville MTA board approved a staff recommendation to award a $532,330 construction contract and a 30% contingency for repair work at the Nestor facility, citing years of geotechnical investigation and a stabilization program. The vote was by voice.

The Nashville Metropolitan Transit Authority board voted to authorize staff to contract for repairs to a long-running sinkhole at the agency’s Nestor lot, approving the base bid and alternate plus contingency that together authorized $692,029 for the project.

Board members heard a presentation from Patrick Hester, who traced the problem to subsurface erosion tied to a 48-inch sanitary sewer line. Hester said geotechnical work by CDM Smith and Athena — including 77 borings down to bedrock — found visible breaks and silt…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans