Planning commission approves duplex with attached ADU at 2436 East Whitmore Avenue
Summary
The commission approved a site plan for a two-story duplex with an attached ADU at 2436 East Whitmore Ave. Staff said the design meets downtown-specific-plan standards and provides five parking spaces (two covered, three uncovered). Vote was 4-0.
Get email alerts on the Site Approval Housing topic
No spam. Unsubscribe anytime.
The Ceres Planning Commission unanimously approved a site-approval application for a duplex with an attached accessory dwelling unit (ADU) at 2436 East Whitmore Avenue.
Planner Julian presented the proposal for a 5,449-square-foot parcel in the downtown specific plan. The application proposes a single two-story building that contains two primary dwelling units plus an attached ADU for a total of three residential units. Julian said the project meets density and development standards for the downtown specific plan, including setbacks, building height, and parking. Staff recommended approval.
During public comment a City of Ceres representative raised questions about whether covered parking was provided and how many parking stalls the design included. Julian clarified the layout: two covered parking spaces beneath the structure (covered parking under the ADU) and three uncovered spaces, for a total of five parking stalls. Julian said the parking calculation is consistent with the code requirement used for the project (1.5 spaces per primary unit and one space for the ADU).
After brief commission questions about the covered parking arrangement, a motion to approve the site plan passed on a 4-0 roll-call vote.
What was decided: The commission approved staff’s recommendation for site-approval of the East Whitmore duplex and attached ADU at 2436 East Whitmore Avenue. Conditions of approval were not detailed on the record; staff will finalize the permit paperwork according to standard procedures.
Next steps: Staff will complete final permit paperwork and return any ministerial paperwork to the applicant; no appeals or additional hearings were announced at the meeting.