Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Contractor says dome at 802 Green Street is structurally deficient; work halted pending engineered plans

Augusta Historic Preservation Commission · March 27, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

A contractor reported that work on a church dome at 802 Green Street stopped after the building inspector deemed the existing wooden superstructure deteriorated and ordered an engineered redesign; commissioners discussed permits, safety risks and next steps.

Contractor Anthony Mallett told the Augusta Historic Preservation Commission that work to remove and repair the dome at 802 Green Street has stopped because the building inspector required an engineered design to replace the deteriorated wooden frame.

Staff presented inspector notes and photo evidence showing decay of the dome superstructure. The…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans