Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Codes And Standards topic

No spam. Unsubscribe anytime.

Bend staff: updated dry-well stormwater standards expected to take effect May 15

Water Advisory Group, City of Bend · April 6, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

City staff told the Water Advisory Group that updated dry-well (UIC) standards — including deeper dry wells, siting and revised horizontal/vertical setbacks — should be signed by city engineers in the coming weeks and would take effect roughly a month later, around May 15.

City of Bend staff told the Water Advisory Group on April 1 that updated standards for dry-well (underground infiltration or UIC) stormwater systems are close to finalization and would allow changes many designers have asked for.

Elizabeth, a city stormwater staffer, said the ‘‘updated changes should be signed off by city engineers weeks from now, and then they don't take effect until a month later, which would be May 15.’’ She said the update incorporates prior WAG input and includes provisions for modified, deeper dry wells, siting location requirements and updated horizontal and vertical setbacks, plus an "easy calculation method" template for determining facility size.

Staff said the changes are intended to provide flexibility for developers while ensuring water-quality treatment and aligning with DEQ expectations. The update will be posted with meeting slides and materials when available; staff asked WAG members to review the draft and share comments before implementation.