Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Brookfield approves design funding for Moose Mountain Bridge; construction estimate could top $400,000
Summary
Town meeting approved withdrawals totaling $207,000 (split across two reserve funds) to fund an engineering design for the Moose Mountain Bridge. Selectmen said design and permitting will cost about $207,000 and construction could run an estimated $400,000'50,000; residents pressed for grant options and fund balances.
Selectman Ed Ingalls told the town that the Moose Mountain Bridge is on the state's red list and requires repair. The warrant articles authorized withdrawals of $62,000 (Article 14) and $145,000 (Article 15) from two Moose Mountain capital reserve funds to cover part of an engineering and permitting package.
"The cost for the design part is 207,000," Ingalls…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

