Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Council approves engineering work for Southwest Corner infrastructure; rough estimate $3 million
Summary
Council authorized staff to proceed with engineering services and planning for infrastructure (sewer, water, roadway) that would serve a proposed Southwest Corner development; staff gave a high‑level cost estimate of about $3,000,000 and council voted 4–1 to move forward with engineering services and property coordination.
City engineering staff presented a proposal to obtain design and construction documents for a multi‑parcel development on Dayton’s southwest side that would require substantial infrastructure (sewer, water, and a roadway connection from Dayton Parkway).
Staff described the plan layout and said some city‑owned parcels and multiple private…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

