Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Water Infrastructure topic

No spam. Unsubscribe anytime.

City schedules hearing on secondary-water engineering standards; staff outlines pipe sizes, well tie-ins

Enoch City Planning Commission · March 24, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The commission set an April 14 hearing to add Section 3.7.0 to the Engineering Design Standards covering secondary water. Public Works Director Hayden White described 8-inch supply lines and 6-inch subdivision mains and said several wells are being tied into the system; Council Member Trower asked about reclaimed water planning.

The Enoch City Planning Commission voted March 24, 2026, to set a public hearing for April 14 to consider adding Section 3.7.0 to the Engineering Design Standards to establish secondary-water design standards.

Public Works Director Hayden White summarized the draft standards, saying, "For water mains, an 8-inch line will serve the subdivision, with 6-inch mains within the subdivision, consistent with drinking-water service." White emphasized the standards do not create personal liability for staff or developers. Council Member Trower asked whether the plan anticipates using reclaimed or nonpotable water and whether installing two potable lines now could be wasteful if they become obsolete; White replied that several wells are being tied into the system.

Commissioner David Hoopes moved to set the hearing; Commissioner Delaine Finlay seconded and the motion passed. Staff will provide the draft standards and technical details at the April 14 hearing for public and technical review.