Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

CDC votes to fund $26,600 study of erosion and drainage options at FM 2499 pedestrian tunnel

Highland Village Community Development Corporation · April 14, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Highland Village CDC approved a $26,600 funding agreement to hire SPI Engineering to evaluate four options for erosion control and drainage improvements at the FM 2499 pedestrian tunnel, with staff to coordinate with TxDOT and return with renderings and cost estimates.

The Highland Village Community Development Corporation voted April 13 to fund a $26,600 engineering and landscape architecture study to evaluate erosion and drainage solutions at the pedestrian tunnel on FM 2499. The study, proposed by staff, will develop four conceptual options with probable costs and renderings and will include coordination with the Texas Department of Transportation.

Staff (Staff member S6) told the board the study will identify the most cost-effective alternative and present conceptual landscape renderings…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans