Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Board approves design development package for Stillwater High athletics phase 1

Stillwater Public Schools Board · January 13, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Stillwater Public Schools board authorized 5 0 5 architects to prepare construction documents for the high‑school athletics phase 1 project, authorizing bids and moving the $22.5 million‑class project toward construction with the board approving the package by roll call vote.

The Stillwater Public Schools board voted to approve the design development package for the SPS Bond 2023 High School Athletics Phase 1 project and authorized 5 0 5 architects to prepare construction documents.

The motion to proceed with construction documents, made and seconded at the meeting, passed on a roll call after a multi‑member presentation and lengthy discussion of schedule, scope and budget. Brian Thomas of 5 0 5 architects presented the 100% design development documents and…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans