Officials presented a resolution correcting mapped road names (Mahaffey Grove → Candy Branch; Sturgeon Creek → Big Springs), reported completion of a bridge tie-in, and discussed reopening bids for steel cribbing and guard rail work with a two-week advertisement period.
Speaker 1 presented a resolution to correct map names for local roads and placed the measure on the record for action, saying Mahaffey Grove should be recorded as Candy Branch and Sturgeon Creek as Big Springs.
Speaker 1 also reported bridge work is complete where the bridge ties into other properties and described specifications discussed by a vendor, including bids for 20 pieces of 40-foot steel cribbing with guard rails and stabilizing features. The court discussed reissuing bids with a two-week advertising period and a plan to reopen on May 1.
“I think we ran in the paper so everybody knows we're gonna put it in,” Speaker 1 said, describing the plan to notify the public before reopening bids.
No detailed contract awards or final bid tallies were recorded in the transcript; the court scheduled steps to advertise and reopen competitive bids and asked staff to assemble required documents for the bidding process.