Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Planning board approves field‑change modifications at 241 Sturbridge Road
Summary
The board approved a field-change that raises the first-floor elevation by about 2.1 feet at a large 1.2-million-square-foot warehouse site on Sturbridge Road; the change added some trailer parking spaces, required small retaining walls and removed two loading bays, with engineers saying stormwater performance remains compliant.
The Charlton Planning Board on March 18 approved a field-change modification for the large warehouse project at 241 Sturbridge Road that raises the first‑floor elevation by approximately 2.1 feet.
Robert Phillips (S8), civil engineer with Langan Engineering, told the board the elevation increase was driven by updated earthwork estimates intended to…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

