Citizen Portal
Sign In

Get AI Briefings, Transcripts & Alerts on Local & National Government Meetings — Forever.

Madrid-Waddington board approves letter to Nexamp on battery energy storage PILOT project

Board of Education of the MADRID-WADDINGTON CENTRAL SCHOOL DISTRICT · March 17, 2026

Loading...

AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved a letter to Nexamp concerning a proposed Battery Energy Storage System PILOT at 658 County Route 31, Madrid, NY; the motion passed unanimously and was recorded as NO. 2026-092.

The Board of Education approved (NO. 2026-092) sending a letter to Nexamp regarding the Battery Energy Storage System PILOT project located at 658 County Route 31 in Madrid, New York.

The motion was made by Amber LeFleur and seconded by Chris Pryce; the vote was unanimous. The minutes record the board’s authorization to send the letter but do not include the letter text or the board’s substantive position on the project beyond approving the correspondence.

No public commentary or contested debate on the Nexamp item is recorded in the minutes provided; the record shows the board took a routine procedural step to communicate with the developer.