Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Wastewater Planning topic

No spam. Unsubscribe anytime.

Bolingbrook hires Robinson Engineering for wastewater plant planning; cost capped at $61,890

Mayor and Board of Trustees of the Village of Bolingbrook · April 1, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The village approved Resolution 26R-038 to retain Robinson Engineering for planning and design services for capital improvements to Wastewater Treatment Plants 1 and 2, with a maximum cost of $61,890. The measure passed 5-0; one trustee was absent.

Bolingbrook Trustees on March 24 approved hiring Robinson Engineering to identify and evaluate capital improvements needed at Wastewater Treatment Plants 1 and 2, authorizing professional planning and design services at a cost not to exceed $61,890.

The board adopted Resolution 26R-038 on a motion by Trustee Jose Quintero, seconded by Trustee Jean M. Kelly. The roll call vote was 5 yeas, 0 nays; Trustee Troy J. Doris was absent.

According to the resolution text in the meeting record, the plants have "structural, operational and regulatory deficiencies" that will require future improvements; Robinson Engineering will prepare a planning-level evaluation the village can use to schedule capital work and budget accordingly. The record states the proposal was reviewed and recommended by the Public Service and Development Committee.

Next steps: the village will proceed with the planning and design contract up to the stated maximum; the meeting record does not provide a timetable for deliverables or a detailed scope beyond planning and evaluation.