Council accepts 10th Avenue SE feasibility report, orders project and schedules public hearing

New Prague City Council · December 2, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The council accepted a feasibility report for the 10th Avenue SE project and ordered the project to move to a public hearing in about two weeks; staff and neighbors favored converting the corridor to two lanes with bump-outs to improve pedestrian safety.

The council unanimously accepted a feasibility report and ordered the 2026 10th Avenue Southeast street-improvement project to proceed to a public hearing, with staff and neighborhood feedback favoring a two-lane conversion with curb bump-outs for pedestrian safety.

City Engineer (presenting) described three options: Option 1 — resurfacing and restriping back to the existing three-lane cross-section with some crosswalk and flashing-beacon upgrades; Option 2 — keep the three-lane configuration but add a vegetated center median; Option 3 — convert to a two-lane roadway with parking lanes and curb bump-outs that reduce pedestrian crossing distance from about 44 feet to ~28 feet and add mini roundabout improvements at 3rd Street SE.

The engineer gave estimated construction costs and project totals for each option: Option 1 construction ~ $920,000 (project ~$1.2M); Option 2 construction ~ $1,140,000 (project ~$1.48M); Option 3 construction ~ $970,000 (project ~$1.26M). Funding sources staff identified include assessments (approximately $180,000, largely on city-owned property), municipal state-aid (MSA) and a local grant application (LRIP) to cover safety elements, and local/general contributions for the mini-roundabout and trail work.

Matt Rinda, director of public works, and staff reported neighborhood meeting feedback that generally opposed medians because of maintenance and snow-salt concerns and favored the two-lane option with bump-outs for improved pedestrian safety and maintainability. Staff recommended Option 3 as the best balance of safety, maintenance, and cost.

Councilmember Rick Seiler moved to accept the feasibility report and order the project; Bruce Wolf seconded. The motion passed 5-0, and staff will schedule a public hearing two weeks after the meeting where the project and assessment details will be presented and a final option can be chosen.