Council approved replacement and related piping work after staff reported leaking and a seam split in two poly fire-suppression tanks; the system is currently drained and not fully operational, prompting immediate repair authorization with vendor MBI.

Dayton City Council unanimously approved replacement of two failing fire-suppression tanks on June 10 after staff reported significant leaks and a split that left the system inoperative.

Staff told the council that one tank developed a leaking flange while the other ‘‘has just split’’ earlier this year; the tanks were drained and the fire-suppression system was not fully operational. "The tank has just split and I have no idea how that split," a staff member said while describing the failure and the need for immediate work. Staff recommended replacing the tanks and updating rigid piping to add flexibility and supports.

Council discussed whether manufacturing defects or installation issues were to blame, and staff confirmed the replacement quote included removing the old tanks, disposal, pipe work and added support. The tanks are 10,000-gallon poly units, staff said. Council member moved to approve the work with MBI as the vendor; the motion was seconded and carried 4-0.

Council directed staff to proceed with replacement to restore the fire-suppression system; staff said the work includes tank removal, new tank installation and pipe modifications to reduce stress on connections.