Council reviews new-well test results; iron above MCL and flow rate still pending
Summary
Staff reported preliminary sampling for a potential new well found elevated iron (about 2.5 times the MCL) but otherwise acceptable contaminants; PFAS currently has no state MCL and flow-rate testing remains outstanding. Council authorized proceeding with ordinance readings if tests support purchase.
Get email alerts on the Infrastructure topic
No spam. Unsubscribe anytime.
Staff briefed council on sampling results for a proposed new well and the possibility of purchasing the land. The engineer (speaker 9) said preliminary results show iron levels "just over 2 and a half times the MCL," but that iron is treatable through filtration. The office explained that the flow-rate (gallons per day) has not yet been determined and is a key outstanding metric before the city finalizes a purchase decision.
Councilors asked when the remaining tests would be available; staff said additional flow and sample work could return in one to two weeks. The engineer also noted PFAS readings were marked in the results but that a maximum contaminant level for PFAS has not yet been established by state regulators, so the results are difficult to interpret against a regulatory threshold.
Council discussed timing for ordinance readings needed for a land purchase and agreed to move forward with first reading and a second reading at subsequent meetings if final test results allow. Staff said they expect data in time for late April/May ordinance steps but cautioned the schedule will be tight.
Why it matters: A new well could provide additional water capacity for Perry but must demonstrate adequate flow and acceptable treatment needs; elevated iron would require filtration but is not necessarily disqualifying.