Presenter recommends curb-and-gutter, crosswalk at sports-authority entrance; cost estimates to follow
Summary
Kevin Musick described a sidewalk and curb-and-gutter option for the sports-authority entrance, saying current plans stop short and a curb-and-gutter would address water and aesthetics; he did not have final footage or cost numbers and staff said they would provide estimates by email.
Get email alerts on the Sidewalks topic
No spam. Unsubscribe anytime.
Kevin Musick, introduced to the meeting as the presenter on sidewalk options, described the current plan for the entrance near the sports authority: the curb stops at the turn and the plan includes a two-foot shoulder with drainage. Musick recommended installing curb-and-gutter at least to the new entrance to improve water handling and appearance and noted a potential crosswalk at that location.
Musick told the group he did not yet have final footage or cost figures; staff said the designer (Tim) was working on footage and numbers and that the values could be provided by email when available. Members discussed authorization to pay for the work in principle but agreed to wait for specific numbers before taking formal action.
Next steps: design staff to provide footage and cost estimates by email; the group will consider a motion if the numbers are presented at a future meeting.