Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Commissioners press developers on glazing, circulation and temporary dumpster at Brickworks revision
Summary
Developers seeking revisions to the Brickworks Lot 4 site plan said they are bringing a two-story, ~30,000 sq ft Club Studio fitness operator and asked for multiple modifications including reduced ground-floor glazing and a temporary dumpster location; staff said it does not support the low-transparency request and commissioners urged more brick and design elements to make non-glazed façades look intentional for future tenants.
Developers and tenants presented revisions to the Brickworks mixed-use site (Lot 4), focusing on two pads: a two-story, ~30,000-square-foot studio-led fitness operator for Pad 1 and a refined footprint for a second retail pad. Eric DeVito of Greenberg Gibbons introduced the changes and said the team removed a previously proposed drive-through and refined the building footprints to better match tenant needs.
Jay Diamond (applicant team) said the proposed fitness concept is a two-story, studio-led operator with a roughly 15,000-square-foot floor plate per level. "This concept is now 30,000 square feet, 2 story," he…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat
