Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Permits And Fees topic

No spam. Unsubscribe anytime.

Freestone County considers raising septic-permit fees as inspections and workload grow

Freestone County Commissioners Court · March 18, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

County staff proposed increasing on-site sewage permit fees — currently $210 for residential, $410 for some commercial types — after a large rise in permit volume and more frequent inspection trips; commissioners asked for classification details before deciding.

Freestone County officials discussed a proposal to raise on-site sewage (septic) permit fees as permit volume and inspection demands increase. Staff (S10) told the court the county currently charges $210 for residential permits and $410 for certain commercial or nonresidential permits and noted that neighboring counties’ fees are higher (examples cited: Anderson County about $3.25xx, Leon County $460). The last fee increase was in 2013, when residential fees moved from $160 to $210.

Staff said the county’s field inspector (Steve Black) is handling multiple trips per permit in some cases, including large properties and multi-household sites that require larger holding capacities and more complex systems. As staff explained, Texas Commission on Environmental Quality design rules (60 gallons per person per day) and multi-household situations can require larger tanks and additional inspections; staff gave an example of a dwelling with 28 bunk beds that would drive substantial design and storage needs.

Commissioners asked for more detailed classifications and a timeline for any fee change. Chair (S1) and staff agreed to compile a classification list and additional technical details (which systems generate higher inspection loads) before bringing a final fee recommendation back to the court.

Next steps: County staff will prepare a detailed classification of permit types, estimated inspection frequency, and a recommended fee schedule for commissioner review.