North Aurora approves $463,573 agreement for corrosion-control study after lead action levels exceeded

North Aurora Village Board ยท May 5, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board authorized a professional-services agreement with EEI (with Cornwell Engineering Group) totaling $463,573 over three years to conduct an IEPA-required corrosion-control study after several water samples exceeded lead action levels; the first-year cost is $260,000.

The North Aurora Village Board on May 4 authorized a professional-services agreement with EEI for a corrosion-control study required under Illinois Environmental Protection Agency (IEPA) lead-and-copper rules.

Staff (Brian) said several water samples had exceeded the action level for lead, triggering the need for an IEPA-required corrosion-control study. The scope includes project management, pipe harvesting, scale analysis, flow-through studies and a summary report. The total cost is $463,573, to be paid across three fiscal years; the village has $450,000 currently budgeted and the first-year cost is $260,000.

Staff recommended entering the PSA with EEI and Cornwell Engineering Group to complete the required technical work. The board approved the agreement by roll call.