Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Surveyor outlines $133,742 Maria drain reconstruction; board accepts proceedings and schedules June 15 hearing
Summary
The surveyor presented a reconstruction plan for the Maria drain with an estimated cost of $133,742 (12% contingency), a benefit estimate of $807,689.58 and proposed use of ARP funds; the board accepted two proceedings (HCDB2602 and HCDB2603) and set a public hearing for June 15 at 5:00 p.m.
The board reviewed the surveyor's report on the Maria drain reconstruction and an associated assessment modification. The surveyor described replacing a collapsed 12-inch clay tile with an 18-inch tile, performing open-ditch maintenance, and cutting a roughly 100-foot swath through wooded areas to limit tree-root intrusion.
Estimated project cost was presented at $133,742 with a…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

