Commission approves $818,714 in safety equipment and public-works contracts, plus a new medical-office site plan
Summary
The commission approved purchasing 32 Meridian portable roadway barriers and four trailers for $483,170.72, awarded TD Thompson $203,712.19 for percolation-pond repairs (10% contingency) and $131,831.33 for parking improvements, and approved a site plan for a 15,348-square-foot Center for Digestive Health medical office building at 1600 Daniels Road.
Get email alerts on the Procurement topic
No spam. Unsubscribe anytime.
The Winter Garden City Commission approved several procurement and infrastructure items, including a public-safety equipment purchase and two construction awards, during the regular meeting.
Police Chief Graham (speaker 4) asked the commission to approve the city's purchase of Meridian portable roadway barriers, saying the acquisition of portable roadway barriers is "essential to enhancing the public safety, improving event management efficiency, and meeting the city's operational responsibility during downtown special events." Staff recommended purchasing 32 Meridian barriers and four trailers for an amount of $483,170.72; the chief said the cost has been included in this year's budget. The commission approved the purchase unanimously.
City Engineer Monahan (speaker 13) recommended issuing a purchase order to TD Thompson for percolation-pond repair in the amount of $203,712.19, including a 10% contingency, after staff discovered a sizable hole in a large collection pipe that discharges to Lake Apopka. In questions from commissioners, Monahan said, "It's 16 inch pipe and it's about 300 feet," and added, "And it's about 16 feet deep." The commission approved the award to TD Thompson unanimously.
Monahan also presented a second recommendation for TD Thompson to construct 20 new angled parking spaces along the oval on West Plant Street, with a proposed purchase order of $131,831.33; staff had received two bids and selected the lowest responsible bidder. The commission approved the parking work unanimously.
Separately, planning staff recommended (and the commission approved) a site plan for Lot 3 of the Daniel Daniels Commerce Center at 1600 Daniels Road to allow a two-story, 15,348-square-foot medical office building for the Center for Digestive Health; staff said the design is consistent with zoning and the comprehensive plan and recommended approval with staff conditions.
Why it matters: The combined approvals authorize public-safety equipment used at downtown events, urgent repair work to protect infrastructure and a downtown parking expansion aimed at easing constrained parking; the percolation-pond repair also prevents further damage to connected infrastructure and discharges into Lake Apopka.
Next steps: Staff will finalize purchase orders and issue contracts to the selected contractors; Monahan indicated the repair work involves substantial excavation and will proceed under the city's construction oversight.