Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Neighbors press planning board on proposed Valley Brook Road tower, citing stormwater and road safety

New Hanover County Planning Board · May 8, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

At a preliminary forum for special use permit S2602, Telfair Forest residents urged planners to deny a 130-foot wireless tower planned for Valley Brook Road, raising concerns about wetlands, stormwater, emergency access and construction traffic; applicant said technical experts and mitigation plans will be presented to the commissioners.

At a May 7 preliminary forum the New Hanover County Planning Board heard sustained opposition to special use permit S2602, a proposal for a 130-foot wireless support structure on Valley Brook Road. The hearing was informational; final action will be at a quasi-judicial hearing before the Board of County Commissioners on June 1.

Telfair Forest HOA president Troy Eason and other residents described the site as a low-lying bowl with wetlands and an access road they say was not engineered for heavy construction traffic. Eason warned that construction and equipment could create a damming effect that would breach the only access…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans