Adams County approves Seltzer Heights preliminary plat but bars building permits until nearby oil‑and‑gas wells are resolved
Summary
The board approved the 227‑acre Seltzer Heights preliminary plat (PLT 2025‑6) with conditions that prevent issuance of building permits until four nearby 'spud but uncompleted' wells either begin production or are plugged and abandoned in accordance with ECMC standards; two lots nearest an existing signal reservoir pad require full reclamation before development.
Get email alerts on the Land Use topic
No spam. Unsubscribe anytime.
The Adams County Board of County Commissioners on April 7 approved the Seltzer Heights preliminary plat (PLT 2025‑6) for a 227‑acre development that would include 205 single‑family lots, eight nonresidential tracts and extensive open space, but attached a new, agreed condition that halts issuance of building permits until certain nearby oil‑and‑gas wells are addressed.
Staff presented three timing options for a new condition intended to protect future residents during the development phase: (1) require the wells be addressed before final subdivision approval; (2) prohibit building permits until the wells commence production or are plugged and abandoned (staff’s recommendation); or (3) prohibit certificates of occupancy until the wells are addressed. Staff recommended option 2 so grading and infrastructure construction could proceed while homes could not be permitted.
After questions from commissioners about buffers, reverse setbacks and a nearby older facility known in staff materials as the Signal Reservoir pad, the applicant and county counsel negotiated updated wording. The final condition agreed on the record reads: "No building permits shall be issued until all spud but uncompleted wells on the Seltzer LDP pad have either (a) commenced production operations as defined by ECMC rules and regulations or (b) been plugged and abandoned in accordance with ECMC standards. Site grading and construction of public and private infrastructure may occur provided that the applicant first seeks and obtains the necessary permits from the county." The transcript lists specific well numbers tied to the Seltzer pad in staff materials.
Commissioners emphasized the difference between the development phase (drilling, fracking, heavy engines and construction noise) and the operation phase (wells in production), and described the board’s action as a temporary procedural fix while county code on reverse setbacks is revised. "Until the wells are either drilled and in production... there'll be no building permits to build houses," a county staff member explained during the hearing.
The board debated how condition 11 interacts with an existing production pad (the Signal Reservoir): commissioners stressed that two lots closest to that pad will remain off limits until the Signal Reservoir site is fully plugged and reclaimed in accordance with county standards. After extended deliberation, the board approved the preliminary plat with nine findings of fact, 11 conditions (including the revised condition 11) and eight notes by a 4‑1 vote.
Supporters of the approval said the conditions protect future residents while allowing infrastructure work to proceed; some commissioners expressed skepticism about the operator of the Signal Reservoir facility but said the added protections represented an important step while county code is updated.
Staff said the approval does not permit homes to be occupied until the listed oil‑and‑gas issues are resolved and that future filings — final plats, change‑of‑use applications, and engineering reviews — will return to the county for review and permitting.