Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

City accepts low bid to repair Sweetwater Ranch sinkhole; construction to proceed

Mil Creek City Council · April 15, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Mil Creek accepted a responsive low bid from WSB Excavation and Utilities LLC for the Sweetwater Ranch stormwater repair project ($78,393 incl. sales tax). The pipe replacement follows a sinkhole discovered in 2023 and required federal and state wetland permits; funding remains available in the surface water fund.

Mil Creek’s council voted April 14 to accept the low bid from WSB Excavation and Utilities LLC to repair a sinkhole and replace a failed stormwater pipe in the Sweetwater Ranch area.

City Engineer Dan Cardy summarized the background: a sinkhole discovered in 2023 led to investigation that showed the existing pipe had failed; the recommended fix moves the…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans