Facilities staff requested a change order to add an isolation valve to the jail boiler loop to avoid draining treated water during pump maintenance, engineers described urgent pole removals near water and radio towers, and transit staff circulated an ODOT oversight checklist effective July 1 requiring more frequent site visits and documentation.
Get email alerts on the Infrastructure Operations topic
No spam. Unsubscribe anytime.
Daryl Dunegan, Trumbull County Facilities, described a recommended change order for jail boiler work after crews discovered the boilers could not be isolated from pumps. He said adding an isolation valve would prevent the need to drain the chemically treated loop for routine pump maintenance and would save time and chemical costs.
Dunegan also reported that several old utility poles were beginning to sag and encroach on new three‑phase power lines near the March tower and the county water tower; First Energy and Spielman Electric had been contacted and staff requested help expediting removals or replacements because poles could block access and create safety hazards.
At the Trumbull County Fair site, the county engineer described a site‑development plan to provide secure parking for mass‑casualty trailers and UTVs on fairground‑adjacent land and recommended awarding related fencing work to a Canfield contractor after soliciting multiple quotes; bid opening and award were scheduled for late April.
On transit, Mike Salamy, Trumbull County Transit Administrator, circulated an ODOT oversight packet that takes effect July 1 and requires more frequent documented site visits, preventive‑maintenance checks and file reviews; commissioners were told the county will need to designate who will perform transportation‑administrator duties and later pass a resolution.
Ending: Facilities will proceed with the recommended isolation valve change order paperwork, staff will pursue removal or replacement of deteriorating poles with utility partners, and county staff will identify who will accept transit‑administrator responsibilities and prepare the required ODOT documentation.