Crookston examines water and wastewater budgets; lead tests pending, lift-station upgrades proposed

Crookston City Council ยท September 18, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Council and staff reviewed water and wastewater operations and CIP needs, including a well-field study, pending lead-sample results and AE2S-proposed lift-station upgrades totaling roughly $1.5 million within a $2.2M wastewater CIP.

Crookston City staff on Sept. 17 walked council through the water and wastewater budgets for 2026, describing planned rate adjustments, recent lead-sampling, and large wastewater capital needs.

Staff said the city completed a water-rate study and implemented initial increases this year, with small, phased increases planned over the next two years to fund capital needs. "They did a study and determined that our rates were like the second lowest in the state," a water operations presenter said, noting the changes are intended to build reserves for mains and plant work.

On drinking-water safety, staff reported that 20 residential samples were collected in early September for lead testing and that results are pending from the lab; the results will be shared with council and included in the city's annual consumer confidence report (CCR). Staff emphasized an outreach effort to document household plumbing as part of a longer-term lead-service-line mitigation program.

At the water plant, staff described a condensation problem in the raw-water tank room that is corroding plumbing and building finishes; they said a dehumidifier has helped temporarily but an engineer's scope and repair estimate are pending. A $150,000 line item for a well-field study and communications/upgrades was included to explore additional supply and telemetry upgrades.

On wastewater, staff outlined recurring CIP items (sewer-main and manhole rehab) and the AE2S recommendation for a larger lift-station project: roughly $1.5 million for wet-well reconstruction and control upgrades at lift stations 4 and 5, part of a $2.2 million "other improvements" package that would also fund a $250,000 wastewater master plan and model to support MS4 certification and grant applications. Staff said the lift-station work could be funded by bonds or reserves; council asked staff to present funding scenarios.

Council requested that staff return with clearer revenue/expense reconciliations for water funds and options for funding larger wastewater projects before any bond authorization or other formal financing steps.

No formal vote was taken.