Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Rye Brook planning board approves site plan and work permit for 379 North Ridge Street with stormwater conditions
Summary
The Rye Brook Planning Board unanimously approved a site plan and work permit for 379 North Ridge Street, authorizing a driveway replacement, front walkway and a 16-by-40-foot rear-yard pool while requiring a construction management plan, five-day building-inspector notice and stormwater mitigation via an underground infiltration system.
The Rye Brook Planning Board voted to approve a site plan and work permit for 379 North Ridge Street after the applicant described proposed yard and driveway work and the board confirmed standard mitigation and permit conditions.
Greg Kupipoli, the project engineer, told the board the work will include a new front walkway, replacement of the existing driveway with concrete, and a 16-by-40-foot pool and pool patio in the rear yard. Because the proposal disturbs more than 400 square feet, Kupipoli said the design…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

