The Angola Historic Preservation Commission approved a certificate of appropriateness for a new awning at 111 North Wayne for Best Dress Boutique, requiring installation methods that minimize damage to historic masonry and allowing reuse of the applicant’s existing awning/logo if the new one does not fit.
Get email alerts on the Historic Preservation Decision topic
No spam. Unsubscribe anytime.
The Angola Historic Preservation Commission voted to approve a certificate of appropriateness for a new awning at 111 North Wayne, the future home of Best Dress Boutique, at its April 15, 2026 meeting.
Staff recommended approval after reviewing the proposed awning — a shed-shaped, black-and-white Tempest fabric design with closed ends, an aluminum mill‑finish frame, an estimated 17-foot width and 4-foot projection, and a digitally printed vinyl logo — and finding it generally compatible with the character of the downtown historic district and the commission’s guidelines. “Based on these considerations, staff finds the proposed awning meets the intent of the historic preservation guidelines,” the staff presentation said.
Courtney Fender, the business owner named in the application, is relocating Best Dress Boutique from the outlet mall into downtown Angola. Her representative, Bradley Noel, described installation plans and raised concerns about potential brick damage during removal and reattachment of the existing mounting. “We’re not sure if we really want to go that route if we want a smaller one just because of the width of the building,” Noel said, and added that the team would avoid damaging brick and would prefer to anchor into mortar if any attachment into masonry were required.
Commission members pressed staff to add an explicit installation condition. The motion approved by voice vote requires installers to avoid damaging original materials and, where attachments into the wall are needed, to use mortar joints rather than drilling into brick. The approval also allows the applicant to clean and reuse the existing awning and place the applicant’s logo on it if the new awning does not fit the storefront opening.
The transcript records the motion as approved with four members voting in favor; no roll-call tally with individual recorded names appears in the record. Staff noted that the applicant is not requesting a facade grant and indicated the applicant currently expects to have installation performed by a partner (the applicant noted no direct project cost reported to the commission). The commission’s review cited guidance that awnings should fit above storefront openings, avoid covering defining architectural elements, and minimize damage to historic materials.
Next steps: staff will record the approved certificate of appropriateness and the installation condition in the meeting minutes; installers should follow the mortar-anchoring guidance to avoid harm to the building’s facade.