Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

District outlines $650,000 fix for Lakes High School floor damage; warranty window lapsed

Clover Park School District Board of Directors · March 23, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

District staff recommended repairing roughly 24,490 sq ft of second-floor decking and tile at Lakes High School after finding thin concrete topping over plywood decking; engineers reported no structural failure, the estimated cost is about $650,000, and legal remedies appear limited due to warranty time limits.

Rick Ring, executive director for district operations, told the board that staff have identified widespread deterioration of the second-floor concrete topping on the Success Building at Lakes High School. Ring said engineers found no structural compromise but determined the topping was thinner than specified and was placed over a plywood deck rather than a steel deck, choices made during construction…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans