Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Dnr Landing topic

No spam. Unsubscribe anytime.

Commission reviews DNR kayak-landing design; construction slated for 2026

Dayton Parks Commission · September 2, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

MSA and staff presented a DNR-reviewed kayak and motorized boat landing layout for the Mississippi/Crow area; staff said the design follows DNR standards and that construction is expected in 2026. Commissioners flagged missing trash receptacles in the shown plans.

MSA presented a DNR-reviewed design for an updated public water access and kayak landing that would move the motorized boat launch to the Crow to mitigate silt buildup. Staff stressed the plan follows Minnesota DNR standards and said the city has limited leverage over design elements that fall under DNR jurisdiction.

Marty, speaking for staff, noted the plan had been reviewed by both staff and the DNR and said construction is targeted for 2026 and that the landing would tie into LC Stevens Park work. The proposed layout includes additional parking, stormwater treatment, trailer stalls and lighting; MSA staff confirmed portable toilets and lighting are included in the plan materials but a commissioner pointed out the drawings did not clearly show a trash receptacle and asked staff to verify placement.

Commissioners had no substantive objections to the layout but requested staff confirm trash-receptacle locations and other site amenities to limit litter impacts on parklands. Staff said they would check details and report back as the DNR process advances toward permitting and procurement.