Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Mitigation Plan topic

No spam. Unsubscribe anytime.

Commission approves mitigation plan allowing additional impervious coverage at Copper Drive property

Pewaukee Plan Commission · November 20, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The commission approved a mitigation plan permitting the Taylor property to exceed the standard impervious coverage limit (up to 35%) provided mitigation measures are completed, reviewed and reported as required by code, and staff verifies final grading and rain-garden construction.

The Pewaukee Plan Commission approved a mitigation plan for James and Susan Taylor’s property on Copper Drive that allows the site to exceed the standard impervious coverage limit provided mitigation measures are completed, final calculations are submitted and the engineering technician verifies the constructed mitigation before final sign-off.

Staff explained the ordinance permits up to 35% impervious coverage if a mitigation plan is completed and reviewed; county reporting of final calculations is required. Commissioners expressed interest in on-site verification of mitigation elements such as rain gardens, and staff said the engineering tech will inspect final grading and the constructed rain garden as part of final approval.

A motion to approve the mitigation plan was offered and carried. The approval directs staff to verify final grading and mitigation measures during the engineering sign-off process.