ARB recommends simplifying gables at 700 Sherwood, suggests stain over painted brick; neighbor raises sewer and notification concerns
Summary
At the ARB review of 700 Sherwood Drive, board members suggested reducing front gables for neighborhood fit and recommended considering brick stain rather than paint; a neighbor said he was not notified and raised concerns about sewer connections.
Get email alerts on the Neighborhood Design topic
No spam. Unsubscribe anytime.
During preliminary review of a new house at 700 Sherwood Drive, board members recommended simplifying multiple front gables and urged the applicant to consider stain rather than paint for brick detailing to preserve texture and reduce long-term maintenance.
Applicant Donna said the project team currently plans to paint the brick white but acknowledged the board’s advice to consider alternatives. Board members noted painted brick can disguise brick tooling and that a mineral stain would retain tooling and require less ongoing maintenance. The board also suggested adding transom windows or more glass in the garage elevation to reduce the perceived heaviness of a full brick face.
On landscaping, the applicant reported that the build team plans to add seven replacement trees on the site. The board reiterated that zoning setbacks and many dimensional controls are handled by the planning department and are outside the ARB’s authority.
During public comment, neighbor Gerald said he had not received notification of the work, reported discovering demolition activity and expressed concern about whether the new construction could affect his property’s sewer. City staff and board members advised that engineering and minor land-disturbance permits are required during the permitting process and that a civil engineer will address utility connections and grading; staff offered a follow-up contact for the neighbor.
No final approvals were issued for 700 Sherwood at this session; the item remains preliminary pending submission of coordinated drawings and material decisions.