Zoning board grants setback and landscaping waivers for proposed Southfield oil-change site

Southfield Zoning Board of Appeals · July 1, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved variances allowing reduced setbacks and front-yard landscaping for an oil-change facility at 24412 Southfield Road after staff said the project fits the commercial character and the applicant negotiated a 36-foot green buffer with neighbors.

The Zoning Board approved variances for ZBA Case 25-15 that will allow IMI Ventures LLC to build an oil-change facility at 24412 Southfield Road with reduced setbacks and smaller front-yard landscaping than the code normally requires.

Applicant Ali Murray said the variances are needed to accommodate the building footprint and drive-thru bays and that he had worked with neighbors and the planning department to arrive at the submitted layout. “We came to a conclusion and hopefully this all works out well for everybody,” Murray said.

City staff recommended favorable consideration, noting the layout accommodates the building and drive-thru service bays, that the reduced setback is consistent with the commercial character of Southfield Road, and that the applicant agreed to maintain a 36-foot green buffer adjacent to residences.

There was no public comment at the hearing. Board members asked practical questions about access and signage; the applicant said the entrance and exit would be right-turn in/right-turn out and that signs would be coordinated with a neighboring church and the county road commission. A motion to grant the variances carried; the board told the applicant to work with city staff on required permits.

What’s next: The applicant will finalize site plans and obtain building and sign permits through the city.