Summary

A consultant presented a citywide hydraulic model showing key choke points and recommended a program of smoke testing, CCTV and targeted repairs to remove inflow and infiltration before resorting to major pipe upsizing. Council treated the briefing as information only.

Miles, a consultant presenting the results of a new citywide hydraulic model, told the Belmont City Council that several parallel interceptors and manifolded lift stations are approaching operational limits and that the system experiences the largest stress during the first inches of rain. "Every gallon of rain water that gets in your system during that event is one gallon of capacity for future development that's basically being taken away," he said, explaining why removing extraneous flow (inflow and infiltration, or INI) should be a priority.

The consultant said the model had been calibrated using recent flow-monitoring data and reproduced observed failures from large storms in August and September, including "three reported sanitary sewer overflows" during one September event. That match gave the team confidence that the model can predict where SSOs or surcharge will occur under 2- and 5-year storm scenarios.

Why it matters: The model ties together present-day tributary flows, approved-but-not-built "promised flow" for developments, and measured INI to show whether new projects will push lines past a chosen level of service. Council members and staff said the model will be used to test projects before approvals so the city can avoid surprises and better explain capacity to developers.

What the model shows: Miles highlighted Northern Belmont (parallel interceptors feeding the plant), Morgan’s Branch/Reflection Point, and Dixie lift-station groupings as the most stressed locations in a two-year event. He recommended a mix of low-cost INI reduction work—smoke testing to find uncapped cleanouts, targeted CCTV inspections, and homeowner education or repair programs—before large-scale pipe upsizing.

Council response and next steps: Council thanked Miles and staff; the presentation was information-only with no action required. Councilors asked staff to use the model for pending and near-term applications (examples discussed included Crescent mixed-use and a hotel proposal) and to prioritize smoke testing and localized INI projects in the fiscal planning process. Miles recommended the city adopt an explicit level-of-service target (for example, a 2- or 5-year design storm) so staff and applicants speak the same technical language when evaluating capacity.