Redevelopment commission approves storm‑sewer increase, downtown elevator repairs and grounds contracts
Summary
The Anderson Redevelopment Commission approved an increased allocation for the Edward Plaza storm and sanitary project after low bids exceeded the engineer’s estimate; it also authorized a ~ $294,256 elevator repair contract and awarded mowing/spraying services to Select Lawn Service for $88,610.
Get email alerts on the Infrastructure Contracts topic
No spam. Unsubscribe anytime.
The Anderson Redevelopment Commission approved multiple infrastructure and contracting actions at its April 14 meeting, authorizing increased funding for an Edward Plaza storm and sanitary project, approving repairs to a downtown parking‑garage elevator, and awarding grounds‑maintenance contracts.
Storm and sanitary at Edward Plaza: City engineer Matthew House told the commission that five bids were opened for the Edward Plaza storm and sanitary project and the low bid came in at roughly $344,000–$345,000, higher than his original engineer’s estimate of about $295,000. House attributed the variance primarily to underestimated construction engineering and mobilization/demobilization costs and the recent rise in diesel and fuel prices. He urged the commission to increase the allocation to match the low bid so work can begin; commissioners moved, seconded and approved the requested increase so the contractor could start to meet site schedules, including a private developer’s planned construction in early June.
"The low bid came in at about $345,000," House said, noting that construction engineering and mobilization were larger than originally estimated.
Elevator repair: The commission reviewed a vendor estimate from American Elevator Incorporated to repair the downtown parking‑garage elevator. The presented cost was $294,256. Commissioners discussed whether the elevator shafts—exposed to the elements—could be better weather‑protected to reduce future repairs; staff noted elevators must be inspected annually under state rules. The commission voted to authorize the repair contract.
Mowing and vegetation spraying: Staff reported four bids for mowing and vegetation spraying across redevelopment properties. Select Lawn Service submitted the lowest responsive bid at $88,610 and was awarded the contract based on price and responsiveness; other bids ranged materially higher, and one bidder lacked requested equipment documentation. Commissioners approved the award.
What this means: The actions authorize staff to proceed with contracts so construction and maintenance work can begin; staff indicated the storm work should start promptly to align with private site schedules. The meeting adjourned after the items were approved.