Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Conditional Use Permits topic

No spam. Unsubscribe anytime.

Houston County planning commission recommends three conditional‑use permits; approvals sent to county board for final action

Houston County Planning Commission · April 2, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The county panel recommended three conditional‑use permits — replacement dwellings in Mayville and Yucatan townships and a substantial land‑alteration/pond project in Mount Prairie Township — sending each to the Houston County Board with conditions including erosion control and professional engineer certification for floodplain work.

The Houston County Planning Commission on March 26 recommended that the County Board approve three separate conditional‑use permit applications: a replacement single‑family dwelling for Scott Standish in Mayville Township; a single‑family dwelling for Gabriel Howe in Yucatan Township; and a conditional use permit for substantial land alteration/excavation to create a pond proposed by Thomas (representing the property owner) in Mount Prairie Township.

Standish told commissioners he plans to build a 30‑by‑40 dwelling on or near the footprint of the previous house and that a benchmark survey shows the proposed site should meet floodplain elevation requirements once certified during the building‑permit process. The commission reviewed standard conditional‑use findings (conformance with land‑use plan, erosion and septic review, water‑quality protections and density) and approved a motion recommending the County Board approve the conditional‑use permit with two conditions: compliance with federal, state and local laws and an entry right for the county to inspect compliance.

For the Howe dwelling in Yucatan Township, staff noted prior variances for property‑line setbacks and proximity to a feed lot; the applicant confirmed a 2020 septic replacement and noted the plan replaces the original structure. Commissioners approved the findings and voted to recommend the permit to the County Board; final approval is scheduled for the board meeting on April 7, 2026.

The Thomas land‑alteration proposal drew the most technical review. The applicant said he would excavate a low area to create a wildlife pond and stockpile topsoil temporarily, intending to sell black topsoil. Staff and commissioners flagged floodway and wetland concerns: the DNR provided written comments requesting a 50‑foot setback from a wildlife management boundary and the county's wetland conservation act panel will review the project. Commissioners added conditions specific to floodplain and wetlands: engineer certification before any excavation showing no increase in flood elevations, a 50‑ft setback to the wildlife management area boundary (with flexibility if the applicant negotiates with DNR before the County Board), an erosion‑control plan identifying stockpile locations, and assurances that temporary materials adding to the 1%‑chance flood stage will be removed promptly. The commission voted to recommend the land‑alteration permit with these seven conditions.

Roll calls and motion outcomes were recorded in the transcript; each recommendation will now advance to the Houston County Board for final action.