Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Transportation topic

No spam. Unsubscribe anytime.

Atchison County agrees to reimburse township after culvert overtops; 84" 14‑gauge culvert ordered

Atchison County Commission · May 5, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

After repeated overtopping this year, Kapioma Township and Road & Bridge agreed to install an additional culvert pipe; the township will order an 84" 14‑gauge pipe and the County will reimburse $3,094 (equivalent to the County's baseline), with a formal agreement to be signed by County Counselor Van Parys.

Kapioma Township representatives and Atchison County Road & Bridge staff reported that an 84‑inch culvert installed to replace a damaged bridge has overtopped multiple times this year following heavy rainfall. Engineers recommended adding a 60‑inch 14‑gauge culvert to raise the drainage capacity to an estimated 7‑year event.

Greg Oswald, representing Kapioma Township, said the township and local landowners considered upgrading to a heavier 12‑gauge pipe but ultimately opted for an 84" 14‑gauge culvert from their preferred vendor. The township will place and pay for the order; Road & Bridge estimated work could begin in about two weeks.

The Commission approved a motion directing the County to reimburse the township $3,094 — described in the minutes as the equivalent cost of the County's baseline (a 16‑gauge equivalent plus delivery) — and County Counselor David Van Parys will finalize an agreement with Mr. Oswald. The motion passed 3‑0.

Next steps: the township will order the 84" 14‑gauge pipe from the vendor; County staff will prepare and sign a reimbursement agreement before installation begins.