Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Subdivision topic

No spam. Unsubscribe anytime.

Final plat for Legacy Acres approved with engineering conditions

Waunakee Plan Commission / Village Board ยท May 12, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The plan commission approved the final plat for Legacy Acres (6506 State Highway 19) in the town of Springfield, noting engineering comments on fire-truck access and stormwater tied to Highway 19 culverts; approval was conditional on those engineering clarifications and one commissioner abstained.

The Waunakee Plan Commission approved the final plat for Legacy Acres, a subdivision at 6506 State Highway 19 in the town of Springfield, on the condition that outstanding engineering comments are resolved.

"The preliminary plat was approved by the village board back in February," planning staff said, and noted this property sits in the village's extraterritorial plat jurisdiction. Randy Grove, a member of the development team, told the commission he was available to answer final questions. Staff identified two outstanding engineering items: demonstrating that fire trucks can access all lots and addressing stormwater-discharge and detention-basin maintenance related to culverts on Highway 19.

Commissioners voted to approve the final plat subject to those engineering clarifications. One abstention was recorded on the motion.