Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Shed Variance topic

No spam. Unsubscribe anytime.

Board denies variance for existing shed after neighbor raises safety and property-line concerns

Vermilion Board of Zoning Appeals · February 25, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Board of Zoning Appeals failed to approve setback variances for an existing unpermitted shed; neighbors raised egress, safety and property-line concerns and a survey was scheduled for March 7.

The Vermilion Board of Zoning Appeals declined Feb. 25 to grant setback variances for an existing shed built without a permit, after neighbors raised safety concerns and questioned whether the structure sits on an adjoining property.

Owner Steven Bobbin told the board he built an 8-by-12 wooden shed about three years ago without obtaining a permit because his lot lacks a backyard. Neighbor Dee Dee Forest said the shed, newly placed fences and vehicles have blocked the egress from her home, obstructed exit doors and raised fire-safety concerns. Forest said she has scheduled a property survey for March 7 at a cost she estimated would be about $1,000 and asked the board to protect her property rights and values.

The board discussed procedural options, including tabling the matter until after the survey, and clarified that if a survey shows the shed is on the neighbor’s property the variance would be moot and the dispute would be a civil matter rather than a zoning variance. The chair then moved on motions for rear-yard and side-yard variances (RS1272.12 b and c); the roll call produced mixed votes and the motion failed.

The board’s rejection means the requested variances for existing setbacks were not approved; the owner may reapply with a modified request or pursue other remedies. The board noted building-department records would be checked as part of any follow-up.