The commission approved a special-use permit to allow scoria mining in S½ Section 2, Township 138N, Range 89W, limited to hours of 7 a.m.–8 p.m., capped at 16,000 cubic yards per year, and requiring dust control as directed by the county engineer.
Get email alerts on the Land Use Mining topic
No spam. Unsubscribe anytime.
The Morton County Commission unanimously approved a special-use permit to allow scoria mining from the designated area within S½ Section 2, Township 138N, Range 89W, citing proximity to a highway and a finding that the use is not in conflict with neighboring land uses.
Commissioner Buckley moved to approve the permit; the motion was seconded and carried with all voting aye. The permit was approved with three explicit conditions: hours of operation limited to 7 a.m. to 8 p.m.; a maximum removal limit of 16,000 cubic yards per year; and a requirement that the applicant control dust as directed by the County Engineer.
The minutes record the commission’s factual finding that the site’s proximity to a highway and the absence of conflicting neighboring uses supported approval. The record does not include the applicant’s name or a bond/financial assurance requirement, nor does it record any public comment on the permit.