Summary

The commission approved multiple CIP and improvement‑district items: sanitary sewer rehabilitation (project 1352), 9th Street West tree planting, downtown RRFB pedestrian beacons, Beaton Drive task order, and other project agreements.

At its meeting the West Fargo City Commission approved a slate of infrastructure and neighborhood items on the regular agenda, including sewer repairs, tree plantings and pedestrian‑safety improvements.

Sanitary sewer spot repairs (Project 1352): Dan Hansen said televising and prior rear‑yard alley work identified extensive clay tile pipe deterioration. Staff presented an engineer’s report with a total estimated project cost of $2,266,000 to be funded by capital improvement sales tax (no special assessments). The commission approved the engineer’s report and a task order directing plans and specifications.

Tree planting on 9th Street West (CIP): Staff proposed planting 129 trees from 32nd Avenue to 52nd Avenue to fill gaps in boulevards. A low bid of $52,000 from Green Earth Landscaping was selected using CIP funds; the commission approved the contract.

Downtown pedestrian improvements (RRFBs): Staff asked to create project 2305 and install four rapid‑reflecting flashing beacons at four crosswalks in downtown to increase visibility in low‑light conditions. Estimated cost $5,400 per crossing (about $21,600 total) to be paid from capital improvement sales tax. The commission approved creating the project and installing the RRFBs.

Beaton Drive reconstruction (Improvement District 3010): Hansen requested approval of task order 105 with Moore Engineering for $141,000 to advance right‑of‑way, environmental review and permitting for a multi‑fund project that includes roadway reconstruction and a multi‑use path; commissioners approved the task order.

Overpass and construction management agreements for the 9th Street grade separation (Project 2293) were approved; Hansen said the BNSF easement and temporary/permanent easement fees total $44,845 and BNSF awarded an approximately $600,000 grant to the project.

Votes on these items were carried by voice vote with no roll‑call recorded in the transcript. Staff said residents adjacent to awarded projects will be invited to neighborhood meetings to review schedules and mitigation plans.

What happens next: staff will begin design and procurement steps for each project, schedule neighborhood outreach meetings, and coordinate inspection and restoration standards with contractors.