Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Infrastructure topic
No spam. Unsubscribe anytime.
County approves Industry Communications permit to place fiber along Stokes Road in Precinct 3
Summary
Commissioners unanimously approved Industry Communications’ application to place four fiber cables and a ¾‑inch duct in the Stokes Road right‑of‑way (45 feet) in Precinct 3. The permit requires insurance, performance bonding, Texas811 locates, restoration and fees described in the county’s attachment.
Get email alerts on the Infrastructure topic
No spam. Unsubscribe anytime.
Commissioner Keith Neuendorff moved Nov. 24 to approve an application by Industry Communications to install fiber optic cable within the right‑of‑way of Stokes Road in Precinct 3; the motion passed 5–0.
The submitted application and county permit specify the proposed construction: four fiber cables plus a ¾‑inch duct over an overall distance of 45 feet. The permit and agreement require drawings showing location, subsurface locates through Texas811 before excavation, that open‑cut trenching be limited and restored to existing or better conditions, a performance bond (minutes list a $2,500 per mile requirement in the agreement), minimum insurance limits (commercial general liability $1,000,000 per occurrence and other coverages), and a 180‑day permit term. For oil & gas industry applicants the minutes list a $1,000 permit, inspection and document review fee and a $500 fee per open cut where applicable.
Commissioner Neuendorff made the motion, Commissioner Darrell Gertson seconded, and the court recorded a unanimous vote. The permit packet attached to the minutes includes exact lat/long coordinates for the start and end points on Stokes Road and technical specifications for handholes and burial depth.
