Meeker County board approves permits, paving contracts and consultant work; water-appropriations condition added to feedlot expansion

Meeker County Board of Commissioners · May 20, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Meeker County Board approved several land-use permits (shoreline and feedlot expansion), interim mining and second-dwelling permits, awarded paving and inspection contracts, and approved consultant services; the feedlot expansion approval includes a condition requiring an MPCA water-appropriations permit before construction.

The Meeker County Board on May 19 approved multiple routine and project-specific items, including conditional-use permits, interim-use permits, paving contracts and consultant services. Most motions passed by voice vote with no recorded roll-call tallies except where noted.

Key actions approved by the board:

- Conditional Use Permit CUP 16785 (trap/shooting range shoreland grading at Lake Byron, Collinwood Township): staff recommended and the board approved the permit after a presentation by Land Use Records Director Greg Schultz. The project will raise shooting-station areas 6 to 24 inches with approximately 3,000 cubic yards of material to improve drainage.

- Conditional Use Permit CUP 16789 (feedlot expansion, Kingston Township): the board approved an application to expand the slaughter-steer feedlot to about 2,900 animal units, with conditions. Staff noted the Minnesota Pollution Control Agency (MPCA) required a water-appropriations permit for the project; the board included a requirement that the applicant square the water-appropriations permit with MPCA before beginning construction.

- Interim Use Permit IUP 16774 (aggregate mining renewal, Gilbert Anderson Pit, Dassel Township): the board approved a six-year interim use permit for aggregate mining and processing; the site will be reclaimed to cropland once mining ceases.

- Interim Use Permit IUP 16780 (temporary second dwelling for family care, Grove City): the board approved a 20-year temporary second dwelling to allow a relative to live on site and assist an aging parent.

- Public-works contracts: the board awarded the SAP047614024 (Cassatt 14) paving contract to Knife River of Sauk Rapids for an estimated $1,594,311.33 (funded by state-aid construction funds); it awarded the Justice Center parking-lot paving contract to Hansen Paving (Sauk Rapids) for an estimated $112,423, and approved a consultant services contract for observation and materials testing to Apex Engineering Group (not to exceed $10,016.45).

Most items passed with motions, seconds and unanimous or near-unanimous "Aye" voice votes. Where staff flagged external approvals (for example, MPCA water-appropriations permits or other state sign-offs), the board tied those approvals to permit conditions to ensure compliance before construction starts.

The board also adopted a resolution approving the county's set of 13 performance measures (see separate summary).