Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Infrastructure Roads topic

No spam. Unsubscribe anytime.

Fallon County road crew outlines gravel work, culvert repairs and a plan to crush scoria locally

Fallon County Board of Commissioners · April 20, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Road staff told commissioners they're hauling gravel to a problematic corner in South Plevna, will address narrow approaches and culvert issues (including a cemetery approach), and asked the board to consider locally crushing stored scoria (about 5,000 yards) to reduce hauling costs.

County road staff reported maintenance after recent moisture, including hauling gravel to a key intersection in South Plevna to cure washboarding and grading work planned for Cabin Creek and Cabot Creek Loop. Staff said two existing gates are only 15 feet wide and they will install a 24-foot gate to allow equipment to turn safely.

The crew flagged an approach to Lane Jones Cemetery where a culvert is either plugged or missing and noted an existing easement from the county road into that cemetery. Staff asked commissioners to help coordinate with utility and easement holders so work can proceed. They also described plans to roll sandstone improvements and use heavy rollers to compact material.

Commissioners and staff discussed scoria currently piled on county property and the potential to contract a crusher locally to produce pit-run base material. Staff estimated about 5,000 yards may be available but cautioned local crushers typically prefer larger volumes; they will solicit quotes from nearby firms and report back with cost comparisons and logistics.