Council approves $14,220 replacement pump for wastewater treatment plant

Buckner Town Council · June 26, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The council approved purchase of a replacement wastewater pump after staff reported the existing unit could not be rebuilt; the water/sewer fund has available balance to cover the cost.

Buckner Town Council approved the purchase of a replacement pump for the wastewater treatment plant after staff said the existing pump could not be rebuilt.

Public works staff reported the old pump had a hole in its casing and that an auxiliary pump was currently in use. The replacement cost on the agenda was listed as $14,220 (item referenced as FTC14221). Council members noted the water and sewer fund currently holds roughly $190,000 and moved to proceed with the purchase.

The chair called for a motion; the council approved the purchase by voice vote. No roll-call vote or individual tallies were recorded in the transcript.

Next steps: public works staff will proceed with procurement and installation of the replacement pump and report back on timing and warranty information.